Abstract: Students should be learn how the road side accidents can be minimized on the site of plane and hilly area. This is a new technology which is applicable only a very few places in India. The targeted length for this project is 100 m and the working of this project is to be analysed in SRHU campus/ nearby places in hilly areas
- Safety rolling barrier can be installed at both sides of roads, sharp curve areas, heavey traffic roadways, protruded sites, median strips.
- Made of special chemical compound like hard rubber, Easy to maintain due to seperated barrels (recyclable), less cost to install.
- Roller absorbs collision shock (shock energy > rotational energy), Front rail absorbs 2nd shock, Back rail absorbs 3rd shock, Metal pipe inserted in to strengthen post.
- The cost for this project may be 20,000 or more
Design of Water Supply Scheme”
Faculty: Mr. Akash Deepak Max Student: 3
Abstract: The main objective of this project is to utilize the source of water properly so as to design an effective water supply network for an area. The main objectives of protected water supply scheme are as following
To supply safe and wholesome water to consumers. To supply water in sufficient quantities, to supply water at convenient points and timings, to supply water at reasonable cost to the consumers, to encourage personal and house hold cleanliness of users.
Geometric & structural design of Highway (NH standard) for a proposed area”
Faculty: Mr. Manish Kumain Max Student: 3
Abstract The main objective of this project is to design an efficient road (NH standard) according to IRC. The project work comprises site selection, basic survey work for preparation of L-section, cross section and after that geometric design of highway will be made. The geometric design will be based on speed specifications of NH for the topography as per IRC.
The geometric design will consist important features such as cross s
ectional elements, sight distance considerations, and horizontal and vertical alignment details. In the project work it consist a minimum of two horizontal curve design, which also include design of super elevation, widening of curve etc.
In the short proposed length of highway it consist all physically possible design parameters. After the geometric design, pavement structural design will be made using CBR method. In CBR method pavement thickness for the proposed area will be calculated
Project for Polytechnic
Soil Exploration
of different point of SRHU campus & nearby area
Faculty: Abhay Kumar Verma Max Student: 5
Abstract: In this project we will find a number of properties at
multiple points we create in SRHU campus as well as in nearby area. These
properties are including Moisture content, Specific gravity, Relative Density,
Shear Strength Properties, and Void Ratio etc. These properties will help us to
create a thorough soil properties map of particular area. A recommendation of
possible depth of foundation at different points will also be calculated.
As there is plenty of demand of soil exploring engineers in
civil engineering consultancy. Student of diploma will learn various tests by
performing test multiple times. Student will also learn calculating foundation
depth and application of these index properties.
In concluding stage of this project we will obtain a thorough
soil properties map which can be further use in many civil engineering works.
Survey and soil investigation, planning, preparing working drawings, estimation and scheduling of a work for a small building
Faculty: Mr. Tanveer Ahmad Max Student: 5
Abstract: Students will be given an area to survey different factors which are being considered before construction of a building. After that soil investigation will be performed on site which will give the soil characteristics and bearing capacity of soil. After collecting all data from field student will prepare a 2D plan of a single floor building on auto CAD. Drawing will have complete detail of building components like length, width, thickness etc. on the basis of which detail estimation of amount of material to be used for building calculation will be calculated. Letter on differ phases of work will be scheduled under scheduling work.
Conducting survey, preparation of drawings, Estimate, Material Testing for the improvement and Widening of an existing road.
Faculty: Mr. Tanveer Ahmad Max Student: 5
Abstract: Students will be given a 1 km single or double lane exiting road to survey considering widening of road to be done up to 4 lane. After a Detail survey drawing sheet will be prepare which will show current situation of area nearby of road. After completion of field work material testing will be performed in transportation engineering lab and data will be collected. After all estimation of the project will be done on the basis of surveying, drawing and material testing.
Building construction with plastic bottles.
Faculty: Mr. Jaibeer Ramola Max Student: 5
Abstract: The main objective of this project is to use the waste material which is also hazardous for the floura and fauna. If we use waste plastic bottles then it becomes less expansive and it is much effective for the earthquake prone areas
- This is an effective solution for reusing the plastic.
- Following advantages - Low cost, Non-Brittle, Absorbs abrupt shock loads - Since they are not brittle, there can take up heavy loads without failure, Less construction material, Easy to build, Green Construction
- The cost for this project may be 5000 or more, 2 labours and the related equipment’s required for the soil excavation
Utilization of Plastic Waste In Flexible Pavement Design
Faculty: Mr. Jaibeer Ramola Max Student: 5
The main objective of this project is to use the waste material which is also hazardous for the floura and fauna. If we use this additive then it becomes less expansive and the strength of pavement will be remain same.
- In flexible pavement construction plastic coated aggregate showed better binding property. It has less wetting property and voids.
- Various Advantages - Better binding property, higher softening point, flash and fire point which means it can withstand high temperature and suitability in tropical region, lower penetration and ductility value which means it can withstand higher load.
- The cost for this project may be 5000 or more
Utilization of Marble slurry in cement concrete”